THE IMPROVEMENT OF THE STABILITY PROBLEM OF RESHA GENERATION PLANT IN JORDAN
DOI:
https://doi.org/10.24297/ijct.v4i2b1.3231Keywords:
Stability, generation, energy sector, electricityAbstract
This study, discuss the stability problem of Resha generation plant. The length of the transmission line which connect Resha with Haranah station, decrease the power transferred capacity that increase the risk of transient disturbance on the system, especially when the generators loaded at full load. Beside that several solutions were suggest in order to improve system stability and raise the capacity of transmitted power.
Downloads
Download data is not yet available.
Downloads
Published
2005-08-30
How to Cite
Almofleh, A., & Awad, M. (2005). THE IMPROVEMENT OF THE STABILITY PROBLEM OF RESHA GENERATION PLANT IN JORDAN. INTERNATIONAL JOURNAL OF COMPUTERS &Amp; TECHNOLOGY, 4(2), 426–434. https://doi.org/10.24297/ijct.v4i2b1.3231