@article{Dhib_Soukhal_Néron_Mohamed-Babou_Kerim_2016, title={A bi-objective algorithm for a reactive multi-skill project scheduling problem}, volume={15}, url={https://rajpub.com/index.php/ijct/article/view/4366}, DOI={10.24297/ijct.v15i11.4366}, abstractNote={The aim of this paper is to present project scheduling problem met in a an industrial context. The focus is mainly to the reactive model. In fact, the predictive case was studied in previous works, and this paper presents a solution for a reactive version of the model studied before. We proposed a linear mathematical model for the problem and then we show that this model cannot be used in practice to the solve problem. Then we present a bi-objectve genetic algorithm proposed to solve this problem. Experiment results are provided also.}, number={11}, journal={INTERNATIONAL JOURNAL OF COMPUTERS & TECHNOLOGY}, author={Dhib, Cheikh and Soukhal, Ameur and Néron, Emmanuel and Mohamed-Babou, Hafedh and Kerim, Bedine}, year={2016}, month={Sep.}, pages={7202–7212} }